Skip to content
  • ABOUT

    About

    Company

    Leaderships & Management

    Appraisals

    ISO

    Culture

    Download Brochure

  • VERTICALS

    Verticals

    Marine Design

    Marine Construction

    Production Engineering

    EEXI - CII - GHG

  • EXPERTISE

    Expertise

    Naval Architecture

    Structural Engineering

    Mechanical & Piping Engineering

    Electrical & Instrumentation Engineering

    Safety Engineering

  • RESOURCES

    Resources

    Projects

    Blogs

    Contact

Country Flag
Down arrow
India United Kingdom Singapore USA Turkey
CONTACT US

EXPERTISE

Mechanical & Piping Engineering

Reliability and Transparency in Maritime Engineering

Picture6
Picture7 (2)
Picture5 (2)
Picture4 (2)
Picture3 (1)
Picture2 (2)
Picture1 (2)

Click the image to view full

Layouts

Layout Design with Machinery and Equipment layout with the help of extensive use of intelligent 3D model considering the functional and operational aspects of the machineries, subdivision of the hull, overall weight distribution on the machinery deck, optimization of piping network, access and escape routes, maintenance requirements and material handling aspect.

Machinery Sizing & Specifications

Preparation of detailed technical specification of machinery and equipments as per tender requirements and applicable codes/standards. Selection of correct parameters and details to meet the system requirements, specific requirements of offshore floating installations and optimized design.

P&IDs

Preparation of Mimic diagrams and Process Flow diagrams for various systems. Preparation of detailed P&IDs based on PFDs and system requirements including pipe flow analysis and pipe sizing.

Operating Philosophy

Preparation of basic design documents like Marine operating utilities philosophy, Piping Material Specification and valve material Specification, pipe thickness calculation, pump sizing calculation, design calculations for all utilities.

Utilities Design

Identification of all utility requirements and design of distribution and supply system according to requirements of the end consumers. Interface engineering between topside facilities and marine systems to meet the system requirements of consumers.

3-D Modelling

Preparation of Intelligent 3D model for complete hull and Topside including structural modeling as per hull structural drawings, equipment modeling based on vendor drawings, Piping Modeling as per P&IDs and schematic drawings, Electrical and Instrumentation modeling as per hook up drawings and plot plans, HVAC and ventilation system modeling. Complete clash check and clash removal exercise for error free models.

Data Collection

In case of conversion, where existing hull of VLLC Tanker is used, 3D scanning of the machinery spaces and open deck area is carried out. The cloud model generation is based on 3D scanning and conversion of cloud model into intelligent 3D model (PDMS). This will be extremely critical to identify the modification of existing system, optimized space utilization and integration of new systems with existing systems of Oil tanker. Also better layout of Topside equipments on Main deck of Tanker will be achieved with available existing 3D Models.

Procurement Support

Procurement Engineering including the Generation of RFQ and defining the complete scope of work between equipment vendor and EPC contractor. Technical Evaluation of vendor offers and finalization of equipments details as per bid requirements and regulatory requirements. Technical Liaising with vendor to obtain the requirements for detailed engineering.

HVAC And Ventilation Systems

  •  Heat load calculation for living quarters, switchgear rooms, control room and UPS room.
  • Air Changes calculation for various machinery compartments based on type of equipments installed and regulatory requirements.
  • HVAC and ventilation duct routings for desired air conditioning, pressure balancing, noise and vibration free air distribution. Also Routing of HVAC Duct and Ventilation ducts considering the offshore aspects like Cross flooding and progressive flooding, Spreading of Fire through HVAC and vent ducts.
  • Deciding the correct location and arrangement of vent outlets on open deck with respect to load line requirements and stability requirements of FPSO. Also the isolation of vent ducts from Hazardous area to avoid the mixing of hazardous and non-hazardous environment.
  • Layouts
  • Machinery Sizing & Specifications
  • P&IDs
  • Operating Philosophy
  • Utilities Design
  • 3-D Modelling
  • Data Collection
  • Procurement Support
  • HVAC And Ventilation Systems
  • info@cybermarine.net
  • +91-22-61462400
  • +91-22-61462411

About Us

Company

Leadership & Management

Appraisals

Iso

Culture

Download Brochure

Verticals

Marine Design

Marine Construction

Production Engineering

EEXI - CII - GHG

Expertise

Naval Architecture

Structural Engineering

Mechanical & Piping Engineering

Electrical & Instrumentation Engineering

Safety Engineering

Resources

Projects

Blogs

Copyright 2023. 

ANNUAL RETURN FORM

PRIVACY POLICY

TERMS AND CONDITIONS